    Research on available transfer capability for power system including large-scale wind farms

  • Author

    Jinling, Lu ; Zengzhen, Wei ; Ying, Tian

  • Author_Institution
    Schooling of Electr. & Electron. Eng., North China Electr. Power Univ., Baoding, China
  • fYear
    2011
  • fDate
    16-18 Sept. 2011
  • Firstpage
    2484
  • Lastpage
    2487
  • Abstract
    This paper is to study the change of Available Transfer Capability for Power System including large-scale wind farms.At present,the induction wind turbines have become the dominating type.This paper first described working principle of induction wind turbine,and used PQ model to analyze wind power.Then analyzed and studied the relation between Available Transfer Capability of the system and the wind power into the system. According to the relation between load distribution and power flow feasible boundary,a optimization model of power system based on Interior-Point Method is established to calculate Available Transfer Capability of the system. Comparing the trends of ATC and the wind power into the system, we draw conclusions at the end of this paper.
  • Keywords
    asynchronous generators; load flow; wind power plants; wind turbines; PQ model; available transfer capability; induction wind turbine; interior-point method; large scale wind farms; load distribution; optimization model; power flow feasible boundary; power system; Load flow; Load modeling; Optimization; Wind farms; Wind power generation; Wind turbines; PQ model; available transfer capability(ATC); induction wind turbines; optimization model; the maximum power transfer;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electrical and Control Engineering (ICECE), 2011 International Conference on
  • Conference_Location
    Yichang
  • Print_ISBN
    978-1-4244-8162-0
  • Type

    conf

  • DOI
    10.1109/ICECENG.2011.6057403
  • Filename
    6057403