• DocumentCode
    2022019
  • Title

    Macomber Map: Bringing situation awareness to an ISO control room

  • Author

    Legatt, M.E. ; Clark, M. ; Macomber, G.

  • fYear
    2012
  • fDate
    22-26 July 2012
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    Operator decisions made in regional independent system operator (ISO) control rooms have major effects on whether lights stay on through extreme weather, high energy demand, and normal operations. Operators´ decisions require accurate and timely information. Human factors professionals have researched the need for situation awareness (SA) within the control room of the Electric Reliability Council of Texas (ERCOT). Several areas of potential SA improvement were noted, centering on improving high-level and wide-area views, reducing alarm and dust storms within the alarm system, providing a visual frame of reference to link equipment and physical location, improving naming conventions, and integrating data across multiple systems and tables. Following prototyping and user feedback, ERCOT developed the Macomber Map to implement these improvements.
  • Keywords
    alarm systems; power system reliability; ERCOT; Electric Reliability Council of Texas; Macomber Map; SA improvement; alarm system; energy demand; human factor professional; link equipment; normal operations; operator decisions; regional ISO control room; regional independent system operator control room; situation awareness; user feedback; Energy management; Human factors; ISO; Navigation; Prototypes; Reliability; User interfaces;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power and Energy Society General Meeting, 2012 IEEE
  • Conference_Location
    San Diego, CA
  • ISSN
    1944-9925
  • Print_ISBN
    978-1-4673-2727-5
  • Electronic_ISBN
    1944-9925
  • Type

    conf

  • DOI
    10.1109/PESGM.2012.6343924
  • Filename
    6343924