DocumentCode :
2046867
Title :
Quality assurance of generator and motor insulation system
Author :
Goffaux, R. ; Comte, B. ; Cottet, M. ; Fruth, B.
Author_Institution :
Centrale de Vianden, Soc. Electr. de l´´Oor S.A., Luxembourg
fYear :
2000
fDate :
2000
Firstpage :
512
Lastpage :
515
Abstract :
Dielectric testing is part of quality assurance and preventative maintenance programs. It helps to determine the actual condition of rotating machine insulation and its components. Testing allows users a way to prevent losses due to unforeseen/undetected faults. Dielectric tests can verify the efficiency of corrective measures such as cleaning and drying procedures as well as repair measures. Dielectric testing includes, dielectric response analysis, loss factor and capacitance measurement, harmonic loss quantity analysis and partial discharge pattern recording
Keywords :
capacitance measurement; condition monitoring; dielectric loss measurement; electric current measurement; electric generators; electric motors; inspection; insulation testing; machine insulation; partial discharge measurement; DC depolarisation currents; DC polarisation currents; capacitance measurement; conduction index; corrective measures; dielectric response analysis; dielectric testing; generator insulation system; harmonic loss quantity analysis; loss factor measurement; motor insulation system; partial discharge pattern recording; preventative maintenance; quality assurance; rotating machine insulation; Dielectric loss measurement; Dielectric losses; Dielectric measurements; Dielectrics and electrical insulation; Harmonic analysis; Partial discharge measurement; Pattern analysis; Preventive maintenance; Quality assurance; Testing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Electrical Insulation, 2000. Conference Record of the 2000 IEEE International Symposium on
Conference_Location :
Anaheim, CA
ISSN :
1089-084X
Print_ISBN :
0-7803-5931-3
Type :
conf
DOI :
10.1109/ELINSL.2000.845560
Filename :
845560
Link To Document :
بازگشت