• DocumentCode
    2054974
  • Title

    Curriculum development: Meeting industry needs for transmission expansion planning

  • Author

    Henderson, M.

  • Author_Institution
    ISO New England, Holyoke, MA, USA
  • fYear
    2012
  • fDate
    22-26 July 2012
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    The potential large scale integration of renewable resources and other factors will likely increase the need for transmission system expansion. New engineering graduates must be prepared to perform this work at a time when most planning engineers are nearing retirement. This paper discusses several questions posed by the Power Education Committee regarding curriculum and key skills required of recent graduates entering the system planning workforce.
  • Keywords
    power engineering education; power transmission planning; renewable energy sources; curriculum development; engineering graduates; planning engineers; power education committee; renewable resources; transmission expansion planning; transmission system expansion; Economics; ISO; Industries; Planning; Power engineering; Power system stability; Production; Power system planning; education; engineering graduates; transmission planning;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power and Energy Society General Meeting, 2012 IEEE
  • Conference_Location
    San Diego, CA
  • ISSN
    1944-9925
  • Print_ISBN
    978-1-4673-2727-5
  • Electronic_ISBN
    1944-9925
  • Type

    conf

  • DOI
    10.1109/PESGM.2012.6345157
  • Filename
    6345157