Title :
A solution of preventive control by means of Transient Stability Constrained OPF
Author :
Hakim, Lukmanul ; Wibowo, Rony Seto ; Takayama, Tomohiro ; Yorino, Naoto ; Zoka, Yoshifumi ; Sasaki, Yutaka ; Kubokawa, Junji ; Sabri, Yusra ; Yuan, Yue
Author_Institution :
Universitas Lampung, Bandar Lampung, Indonesia
Abstract :
In the recently deregulated electricity market, a more secure of power system operation is essential. One of the methods to avoid the risk of compromising power system instability is preventive control which often comes in the form of generation rescheduling. This paper attempts to solve transient stability preventive control problem by generation redispatch utilizing the Primal-Dual Interior Point Method (PDIPM) Non Linear Programming (NLP) Transient Stability Constrained Optimal Power Flow (TSCOPF). A linear cost model is derived to accommodate generation redispatch. Our simulation shows that the proposed method is able to solve the transient stability preventive control problem by rescheduling necessary active power generation.
Keywords :
load flow; nonlinear programming; power generation dispatch; power generation scheduling; power markets; power system transient stability; NLP transient stability constrained optimal power flow; PDIPM; TSCOPF; electricity market deregulation; generation redispatch; generation rescheduling; nonlinear programming; power system instability; power system operation; preventive control; primal-dual interior point method; transient stability constrained OPF; generation rescheduling; optimal power flow; preventive control; transient stability;
Conference_Titel :
TENCON 2010 - 2010 IEEE Region 10 Conference
Conference_Location :
Fukuoka
Print_ISBN :
978-1-4244-6889-8
DOI :
10.1109/TENCON.2010.5686765