DocumentCode
2064751
Title
Three stage constrained flow shop scheduling with jobs in a string of disjoint job-block
Author
Sharma, Sameer ; Gupta, Deepak ; Aggarwal, Shefali
Author_Institution
Dept. of Math., Maharishi Markandeshwar Univ., Ambala, India
fYear
2012
fDate
16-18 March 2012
Firstpage
1
Lastpage
6
Abstract
The objective of this paper is to develop a heuristic algorithm to minimize the total elapsed time for n jobs, 3 machine flow shop production scheduling in which processing times and independent set up times, each associated with probabilities including transportation time and breakdown interval. Further the jobs are processed in a string of disjoint job blocks. A computer programme followed by a numerical illustration is given to substantiate the algorithm.
Keywords
flow shop scheduling; numerical analysis; 3 machine flow shop production scheduling; breakdown interval; computer programme; disjoint job blocks; heuristic algorithm; independent set up times; jobs; numerical illustration; processing times; three stage constrained flow shop scheduling; transportation time; Current; Electric breakdown; Job shop scheduling; Probability; Processor scheduling; Transportation; Breakdown Interval; Disjoint Job-block; Flowshop Scheduling; Processing Time; Setup Time; Transportation Time;
fLanguage
English
Publisher
ieee
Conference_Titel
Engineering and Systems (SCES), 2012 Students Conference on
Conference_Location
Allahabad, Uttar Pradesh
Print_ISBN
978-1-4673-0456-6
Type
conf
DOI
10.1109/SCES.2012.6199094
Filename
6199094
Link To Document