• DocumentCode
    2064751
  • Title

    Three stage constrained flow shop scheduling with jobs in a string of disjoint job-block

  • Author

    Sharma, Sameer ; Gupta, Deepak ; Aggarwal, Shefali

  • Author_Institution
    Dept. of Math., Maharishi Markandeshwar Univ., Ambala, India
  • fYear
    2012
  • fDate
    16-18 March 2012
  • Firstpage
    1
  • Lastpage
    6
  • Abstract
    The objective of this paper is to develop a heuristic algorithm to minimize the total elapsed time for n jobs, 3 machine flow shop production scheduling in which processing times and independent set up times, each associated with probabilities including transportation time and breakdown interval. Further the jobs are processed in a string of disjoint job blocks. A computer programme followed by a numerical illustration is given to substantiate the algorithm.
  • Keywords
    flow shop scheduling; numerical analysis; 3 machine flow shop production scheduling; breakdown interval; computer programme; disjoint job blocks; heuristic algorithm; independent set up times; jobs; numerical illustration; processing times; three stage constrained flow shop scheduling; transportation time; Current; Electric breakdown; Job shop scheduling; Probability; Processor scheduling; Transportation; Breakdown Interval; Disjoint Job-block; Flowshop Scheduling; Processing Time; Setup Time; Transportation Time;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Engineering and Systems (SCES), 2012 Students Conference on
  • Conference_Location
    Allahabad, Uttar Pradesh
  • Print_ISBN
    978-1-4673-0456-6
  • Type

    conf

  • DOI
    10.1109/SCES.2012.6199094
  • Filename
    6199094