• DocumentCode
    2067916
  • Title

    Individuality and methodology in large DP projects

  • Author

    Kushner, Dorothy Kleinman

  • fYear
    1991
  • fDate
    28-29 May 1991
  • Firstpage
    64
  • Lastpage
    67
  • Abstract
    Aspects of methodology in correction with large DP projects are discussed. It is pointed out that methodology is a mapping of the stages of a project and/or the deliverables produced by each of these stages against time or against state of completeness. It is further noted that individual resistance to methodology on technical grounds is a positive force, and on psycho-social grounds is a natural reaction to a change in the work context. The introduction of methodology into large DP projects should be defined as a prototyping effort
  • Keywords
    DP management; human factors; social aspects of automation; large DP projects; methodology; prototyping effort; psycho-social grounds; work context; Computer aided software engineering; Engineering management; Object oriented modeling; Productivity; Prototypes; Psychology; Quality management; Software engineering; Standardization; Terminology;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Computer Systems and Software Engineering, 1991. Proceedings., Fifth Israel Conference on
  • Conference_Location
    Herzlia
  • Print_ISBN
    0-8186-2065-X
  • Type

    conf

  • DOI
    10.1109/ICCSSE.1991.151175
  • Filename
    151175