DocumentCode
2083583
Title
A cluster-based evolutionary algorithm for the single machine total weighted tardiness-scheduling problem
Author
Borgulya, István
Author_Institution
Univ. of Pecs, Hungary
fYear
2002
fDate
2002
Firstpage
239
Abstract
In this paper a new evolutionary algorithm is described for the single machine total weighted tardiness problem. The operation of this method can be divided in three stages: a cluster forming and two local search stages. In the first stage it approaches some locally optimal solutions by grouping based on similarity. In the second stage it improves the accuracy of the approximation of the solutions with a local search procedure while periodically generating new solutions. In the third stage the algorithm continues the application of the local search procedure. We tested our algorithm on all the benchmark problems of ORLIB. The algorithm managed to find within an acceptable time limit the best-known solution for the problems, or found solutions within 1% of the best-known solutions in 99% of the tasks.
Keywords
computational complexity; evolutionary computation; production control; scheduling; benchmark problems; cluster forming; cluster-based evolutionary algorithm; deterministic single machine; local search; locally optimal solutions; single machine total weighted tardiness-scheduling problem; Benchmark testing; Dynamic programming; Evolutionary computation; Gold; Heuristic algorithms; Information technology; Single machine scheduling;
fLanguage
English
Publisher
ieee
Conference_Titel
Information Technology Interfaces, 2002. ITI 2002. Proceedings of the 24th International Conference on
ISSN
1330-1012
Print_ISBN
953-96769-5-9
Type
conf
DOI
10.1109/ITI.2002.1024681
Filename
1024681
Link To Document