DocumentCode :
2090825
Title :
Scheduling and control for time-constrained processes in semiconductor manufacturing
Author :
Sun, Dong-Seok ; Choung, You-In ; Lee, Young-Joong ; Jang, Young-Chul
Author_Institution :
Syst. Eng. Team, Samsung Electron., Gyeonggi-Do
fYear :
2005
fDate :
13-15 Sept. 2005
Firstpage :
295
Lastpage :
298
Abstract :
This paper discusses a scheduling problem with delay time constraint arising in the semiconductor manufacturing. The delay time constraint means that a process should be started within delay time from the start step of the process. It becomes more critical to determine the fab yield and product quality. This paper examines scheduling and control problem for semiconductor manufacturing which has time constrained processes. We classify the problem into 3 levels and propose the solution algorithm for each problem. We also explain how to integrate our MES system for the problem
Keywords :
delays; integrated circuit yield; process control; quality management; scheduling; delay time constraint; fab yield; manufacturing execution system; product quality; semiconductor manufacturing; Automatic control; Delay effects; Job shop scheduling; Logic; Manufacturing processes; Process control; Pulp manufacturing; Semiconductor device manufacture; Throughput; Time factors;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Semiconductor Manufacturing, 2005. ISSM 2005, IEEE International Symposium on
Conference_Location :
San Jose, CA
Print_ISBN :
0-7803-9143-8
Type :
conf
DOI :
10.1109/ISSM.2005.1513361
Filename :
1513361
Link To Document :
بازگشت