Risk analysis of butterfly arch continuous girder bridge´s V-shaped pier during the construction process on the basis of AHP-GCA method
Author
Wang Lifeng ; Sun Yong
Author_Institution
Bridges Dept. of Civil Eng. Coll., Northeast Forestry Univ., Harbin, China
fYear
2010
fDate
29-31 July 2010
Firstpage
2585
Lastpage
2587
Abstract
Based on the butterfly arch continuous girder bridge in HeiHe, China, this paper mainly deals with a quantitative risk analysis for V-shaped pier during the construction process, by using Analytic Hierarchy Process - Grey Correlation Analysis method. Firstly, hierarchical model of risk analysis is established, and structural property is identified as the highest risk factors during V-shaped pier construction using the AHP theory. Secondly, the optimal construction scheme with the least risk is chosen from candidates by using GCA method, according data obtained in AHP analysis. It concluded that, the AHP-GCA method shows good accuracy, and has an advantage over qualitative analysis. It is reasonable and applicable, providing a theoretical basis for risk decision-making during the construction of V-shaped pier.
Keywords
bridges (structures); decision making; grey systems; risk analysis; structural engineering; supports; AHP-GCA method; V-shaped pier; analytic hierarchy processing; butterfly arch continuous girder bridge; construction process; grey correlation analysis; optimal construction scheme; risk analysis; risk decision-making; Bridges; Construction industry; Correlation; Indexes; Personnel; Risk analysis; Safety; Analytic Hierarchy Process; Butterfly Arch Continuous Girder Bridge; Grey Correlation Analysis Method; Risk Analysis; V-shaped Pier;
fLanguage
English
Publisher
ieee
Conference_Titel
Control Conference (CCC), 2010 29th Chinese
Conference_Location
Beijing
Print_ISBN
978-1-4244-6263-6
Type
conf
Filename
5573102
Link To Document