• DocumentCode
    2098652
  • Title

    Risk analysis of butterfly arch continuous girder bridge´s V-shaped pier during the construction process on the basis of AHP-GCA method

  • Author

    Wang Lifeng ; Sun Yong

  • Author_Institution
    Bridges Dept. of Civil Eng. Coll., Northeast Forestry Univ., Harbin, China
  • fYear
    2010
  • fDate
    29-31 July 2010
  • Firstpage
    2585
  • Lastpage
    2587
  • Abstract
    Based on the butterfly arch continuous girder bridge in HeiHe, China, this paper mainly deals with a quantitative risk analysis for V-shaped pier during the construction process, by using Analytic Hierarchy Process - Grey Correlation Analysis method. Firstly, hierarchical model of risk analysis is established, and structural property is identified as the highest risk factors during V-shaped pier construction using the AHP theory. Secondly, the optimal construction scheme with the least risk is chosen from candidates by using GCA method, according data obtained in AHP analysis. It concluded that, the AHP-GCA method shows good accuracy, and has an advantage over qualitative analysis. It is reasonable and applicable, providing a theoretical basis for risk decision-making during the construction of V-shaped pier.
  • Keywords
    bridges (structures); decision making; grey systems; risk analysis; structural engineering; supports; AHP-GCA method; V-shaped pier; analytic hierarchy processing; butterfly arch continuous girder bridge; construction process; grey correlation analysis; optimal construction scheme; risk analysis; risk decision-making; Bridges; Construction industry; Correlation; Indexes; Personnel; Risk analysis; Safety; Analytic Hierarchy Process; Butterfly Arch Continuous Girder Bridge; Grey Correlation Analysis Method; Risk Analysis; V-shaped Pier;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Control Conference (CCC), 2010 29th Chinese
  • Conference_Location
    Beijing
  • Print_ISBN
    978-1-4244-6263-6
  • Type

    conf

  • Filename
    5573102