DocumentCode :
2104215
Title :
Evaluation of methodologies for shunt VAr planning
Author :
Jatau, J.A. ; Momoh, J.A. ; Chuku, A.U.
Author_Institution :
Dept. of Electr. Eng., Howard Univ., Washington, DC, USA
fYear :
1990
fDate :
15-16 Oct 1990
Firstpage :
381
Lastpage :
389
Abstract :
Two methods are developed and evaluated for shunt VAr planning. These methods are capable of sizing and siting shunt VAr at optimum cost and with greater reliability. The methods utilize the generalized Benders decomposition (GBD) technique to decompose the VAr problem into two subproblems. The first level of the problem solves an optimal power flow problem by scheduling control variables including existing VAr sources. The two methods for the second-level discrete allocation process use a branch-and-bound enumeration technique and a mixed-integer linear programming technique. The constraints include security while minimizing the total investment cost. Tests on the IEEE 14-bus system have shown both algorithms to be robust and fast
Keywords :
load flow; power systems; reactive power; IEEE 14-bus system; branch-and-bound enumeration technique; generalized Benders decomposition; mixed-integer linear programming technique; optimal power flow; power systems; reliability; second-level discrete allocation process; shunt VAr planning; Costs; Integer linear programming; Linear programming; Load flow; Optimal control; Power system planning; Power system security; Reactive power; Shunt (electrical); Voltage;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power Symposium, 1990., Proceedings of the Twenty-Second Annual North American
Conference_Location :
Auburn, AL
Print_ISBN :
0-8186-2115-X
Type :
conf
DOI :
10.1109/NAPS.1990.151392
Filename :
151392
Link To Document :
بازگشت