The Analysis of Project Schedule Uncertainty: Based on Monte Carlo Simulation
Author
Chen Qi-Wei ; Li Guo-Yin ; Zhuang Qing-Hui
Author_Institution
Manage. Sci. & Eng. Dept., Wuhan Univ., Wuhan, China
fYear
2009
fDate
20-22 Sept. 2009
Firstpage
1
Lastpage
4
Abstract
The method of Program Evaluation and Review Technique (PERT) has been applied to the field of project management extensively. However, traditional PERT is still defective when used in schedule control. According to the principles of PERT and the hypothesis that the activity duration in PERT obeys Beta distribution, this paper points out the disadvantages of traditional method in determining critical path in PERT network program, proposes the concept of "Critical Degree" to describe the importance degree of paths in PERT network, then puts forward Monte Carlo Simulation (MCS) to analyze project schedule uncertainty. The Example shows that MCS can overcome disadvantages of the traditional PERT method. At last, through the sensitivity analysis of each critical activity, this paper points out the critical activities that should be selectively controlled.
Keywords
Monte Carlo methods; PERT; project management; sensitivity analysis; Monte Carlo simulation; PERT network program; beta distribution; program evaluation and review technique; project management; project schedule uncertainty analysis; sensitivity analysis; Costs; Electronic mail; Engineering management; Large-scale systems; Missiles; Monte Carlo methods; Project management; Random variables; Sensitivity analysis; Uncertainty;
fLanguage
English
Publisher
ieee
Conference_Titel
Management and Service Science, 2009. MASS '09. International Conference on
Conference_Location
Wuhan
Print_ISBN
978-1-4244-4638-4
Electronic_ISBN
978-1-4244-4639-1
Type
conf
DOI
10.1109/ICMSS.2009.5303138
Filename
5303138
Link To Document