    The Analysis of Project Schedule Uncertainty: Based on Monte Carlo Simulation

  • Author

    Chen Qi-Wei ; Li Guo-Yin ; Zhuang Qing-Hui

  • Author_Institution
    Manage. Sci. & Eng. Dept., Wuhan Univ., Wuhan, China
  • fYear
    2009
  • fDate
    20-22 Sept. 2009
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    The method of Program Evaluation and Review Technique (PERT) has been applied to the field of project management extensively. However, traditional PERT is still defective when used in schedule control. According to the principles of PERT and the hypothesis that the activity duration in PERT obeys Beta distribution, this paper points out the disadvantages of traditional method in determining critical path in PERT network program, proposes the concept of "Critical Degree" to describe the importance degree of paths in PERT network, then puts forward Monte Carlo Simulation (MCS) to analyze project schedule uncertainty. The Example shows that MCS can overcome disadvantages of the traditional PERT method. At last, through the sensitivity analysis of each critical activity, this paper points out the critical activities that should be selectively controlled.
  • Keywords
    Monte Carlo methods; PERT; project management; sensitivity analysis; Monte Carlo simulation; PERT network program; beta distribution; program evaluation and review technique; project management; project schedule uncertainty analysis; sensitivity analysis; Costs; Electronic mail; Engineering management; Large-scale systems; Missiles; Monte Carlo methods; Project management; Random variables; Sensitivity analysis; Uncertainty;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Management and Service Science, 2009. MASS '09. International Conference on
  • Conference_Location
    Wuhan
  • Print_ISBN
    978-1-4244-4638-4
  • Electronic_ISBN
    978-1-4244-4639-1
  • Type

    conf

  • DOI
    10.1109/ICMSS.2009.5303138
  • Filename
    5303138