Project Scheduling Problem Based on Modular Outsourcing
Author
Chai, Guo-Rong ; Bao, Yin-Li ; Zhang, Guo-Xing ; Su, Ya-Na
Author_Institution
Sch. of Manage., Lanzhou Univ., Lanzhou, China
fYear
2010
fDate
24-26 Aug. 2010
Firstpage
1
Lastpage
4
Abstract
The market competition under globalization promotes enterprises to integrate resources all over the world, and the decision-making of outsourcing is becoming an important influencing factor of project scheduling. Taking subproject TCP/C1-3-1A-1 of Three Gorges Project for example, this paper constructs module network by design structure matrix, and chooses outsourcing module primarily by two levels, then formulates optimization model of project scheduling based on modular outsourcing. The results show that the income of the project is enhanced and the duration of the project is greatly shortened because of synergy effects with modular outsourcing.
Keywords
decision making; optimisation; outsourcing; project management; scheduling; decision making; design structure matrix; globalization; market competition; modular outsourcing; module network; optimization model; project scheduling problem; Contracts; Decision making; Matrix decomposition; Optimal scheduling; Outsourcing; Project management;
fLanguage
English
Publisher
ieee
Conference_Titel
Management and Service Science (MASS), 2010 International Conference on
Conference_Location
Wuhan
Print_ISBN
978-1-4244-5325-2
Electronic_ISBN
978-1-4244-5326-9
Type
conf
DOI
10.1109/ICMSS.2010.5576116
Filename
5576116
Link To Document