• DocumentCode
    2157707
  • Title

    A Process Material Requirement Improvement Model Based on a Strategy of BOM Disassembly

  • Author

    Wu, Zhijun ; Zhang, Jianfu ; Feng, Pingfa ; Yu, Dingwen

  • Author_Institution
    Dept. of Precision Instrum. & Mechanology, Tsinghua Univ., Beijing, China
  • fYear
    2009
  • fDate
    20-22 Sept. 2009
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    The bill of materials (BOM) forms an integral part of material requirement control strategy in the process industries. The process product BOM is divided into a raw material BOM and a packing BOM to allow rapid and manageable separate calculations. Then by discussing the advantages of the basic types of BOM structure, a process BOM constructional model that focuses on the single-layer packing BOM and the Gozintograph-based raw material BOM is designed based on a proposed novel BOM disassembly strategy. Further a new material requirement improvement algorithm for process industries is proposed. Practice shows that the proposed models and algorithms are more targeted and effective, and can be used to solve problems such as the inefficient materials calculation and database data redundancy.
  • Keywords
    bills of materials; stock control; BOM disassembly; Gozintograph-based raw material BOM; bill-of-materials; database data redundancy; packing BOM; process industries; process material requirement improvement model; product BOM; Bills of materials; Chemical industry; Chemical processes; Chemical technology; Construction industry; Industrial control; Manufacturing industries; Materials requirements planning; Production; Raw materials;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Management and Service Science, 2009. MASS '09. International Conference on
  • Conference_Location
    Wuhan
  • Print_ISBN
    978-1-4244-4638-4
  • Electronic_ISBN
    978-1-4244-4639-1
  • Type

    conf

  • DOI
    10.1109/ICMSS.2009.5304184
  • Filename
    5304184