DocumentCode :
2163507
Title :
Multiple capacity single vehicle job scheduling for AGV´s
Author :
Langer, J. ; Sagar, V.K.
Author_Institution :
Essex Univ., Colchester, UK
fYear :
1994
fDate :
5-9 Sep 1994
Firstpage :
348
Lastpage :
353
Abstract :
Although job scheduling for automated guided vehicle (AGV) systems has hardly been investigated, it is a very important problem as it is highly decisive for the performance of such a system. Current solutions focus on the simple case of vehicles loading only one unit at a time. However the introduction of multiple capacity vehicles increases the need for more general solutions. A heuristic optimisation criterion for the problem of a multiple capacity vehicle is proposed, an appropriate algorithm presented and illustrated, and an idea of further research in this field is given
Keywords :
automatic guided vehicles; optimisation; production control; scheduling; AGV; automated guided vehicle; heuristic optimisation; job scheduling; multiple capacity vehicles; production control;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Intelligent Systems Engineering, 1994., Second International Conference on
Conference_Location :
Hamburg-Harburg
Print_ISBN :
0-85296-621-0
Type :
conf
DOI :
10.1049/cp:19940649
Filename :
332016
Link To Document :
بازگشت