• DocumentCode
    2169488
  • Title

    The AF fast start experiment under the room temperature and short HRT conditions in the advanced municipal sewage treatment

  • Author

    Wu, Fuping ; Xue, Bo ; Tan, Zhenzhen ; Yan, Xiaofei ; Wang, Yingchao ; Ding, Hong

  • Author_Institution
    Sch. of Environ. & Municipal Eng., Lanzhou Jiaotong Univ., Lanzhou, China
  • fYear
    2012
  • fDate
    19-21 Oct. 2012
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    AF adopts two steps to start. At first, it forms membrane in aerobic conditions, which fasten the microorganisms on the padding. It adopts intermittent batches aerobic row dry process during the process, which can fasten the activatedsludge on the padding; second, in order that the reactor speeds up the adaptation for effluent, the secondary settling pond effluent and campus life sewage are sent into the AF reactor according to the proportion of dosing complex way into water. The raw water comes from sewage plant, and it starts AF in the temperature of 23-28°C, HRT for 3 to 4h conditions. The experimental results show that the reactor water COD removal rate of the original water stay 28% on average after 7 weeks. It descripts and analyses 3 phase during the anaerobic start, the influence of HRT on the COD removal and the influence of temperature on the COD removal. As a conclusion, the AF is feasible, efficient, low energy consumption in the operation mode in the advanced municipal sewage treatment and also can be used as other deep treatment of wastewater pretreatment technology.
  • Keywords
    bioreactors; effluents; energy consumption; filtration; industrial plants; membranes; microorganisms; sewage treatment; wastewater treatment; AF fast start experiment; AF reactor; HRT removal; advanced municipal sewage treatment; aerobic conditions; anaerobic biofilter; campus life sewage; dosing complex proportion; energy consumption; intermittent batches aerobic row dry process; microorganisms; operation mode; raw water; reactor water COD removal rate; room temperature; secondary settling pond effluent; sewage plant; short HRT conditions; temperature 23 degC to 28 degC; time 3 h to 4 h; time 7 week; wastewater pretreatment technology; Biomembranes; Carbon; Effluents; Inductors; Microorganisms; Sewage treatment; Anaerobic biofilter; short HRT; start;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Geomatics for Integrated Water Resources Management (GIWRM), 2012 International Symposium on
  • Conference_Location
    Lanzhou, Gansu
  • Print_ISBN
    978-1-4673-1283-7
  • Type

    conf

  • DOI
    10.1109/GIWRM.2012.6349637
  • Filename
    6349637