DocumentCode
2178238
Title
Valuation about remaining service life of GBM hydraulic power plant units technical and economical aspects
Author
Hara, T.P. ; Vianna, L.F.L. ; Nachvalger, E.E. ; Goncalves, E.
Author_Institution
Companhia Paraense de Energia-Copel, Curitiba, Brazil
Volume
2
fYear
1994
fDate
3-8 Jul 1994
Firstpage
804
Abstract
The importance of “Governador Bento Munhoz da Rocha Neto-GBM Power Plant”, its time in service and its operating conditions render it necessary to assess the generators´ remaining service life. It was also considered appropriate to review the operating conditions relating them with the economical aspects involved. Based on a model proposed by H. Yoshida and K. Uemoto (1986) and in Copel´s experience, this paper shows not only the elapsed costs of today´s operation planner but also the cost of insulation degradation due to the number of starts and stops. It proposes a new operating condition and suggests insulation tests and maintenance precautions for equipment
Keywords
economics; hydroelectric generators; hydroelectric power stations; insulation testing; life testing; machine insulation; machine testing; maintenance engineering; GBM hydraulic power plant units; Governador Bento Munhoz da Rocha Neto; economical aspects; generator remaining life assessment; hydroelectric generators; insulation degradation costs; insulation tests; maintenance precautions; operating conditions; technical aspects; Aging; Cost accounting; Degradation; Dielectrics and electrical insulation; Partial discharges; Power generation; Power generation economics; Reduced instruction set computing; Stators; Stress;
fLanguage
English
Publisher
ieee
Conference_Titel
Properties and Applications of Dielectric Materials, 1994., Proceedings of the 4th International Conference on
Conference_Location
Brisbane, Qld.
Print_ISBN
0-7803-1307-0
Type
conf
DOI
10.1109/ICPADM.1994.414133
Filename
414133
Link To Document