• DocumentCode
    2186131
  • Title

    Notice of Retraction
    Rethinking the Design Decision-Making Process Based Whole Life Cost Benchmark

  • Author

    Ren Guoqiang

  • Author_Institution
    Manage. Sch., Tianjin Univ. of Technol., Tianjin, China
  • fYear
    2009
  • fDate
    20-22 Sept. 2009
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    Notice of Retraction

    After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.

    We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.

    The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.

    This paper first analysis the shortcoming of current design decision-making process; Then gives the definition and hierarchy structure of WLC benchmark; Third gives construction process of WLC benchmark, including Data collection and storage, WLC benchmark computing methods and the flow diagram of construction process of WLC benchmark; Forth, gives the design decision-making process based WLC benchmark method; Last analysis the advantage and existing questions of applying WLC benchmark method in design decision-making.
  • Keywords
    decision making; design engineering; life cycle costing; structural engineering; construction process; data collection; data storage; design decision-making process; hierarchy structure; whole life cost theory; Asset management; Buildings; Costs; Decision making; History; Information analysis; Paper technology; Process design; Technology management; Uncertainty;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Management and Service Science, 2009. MASS '09. International Conference on
  • Conference_Location
    Wuhan
  • Print_ISBN
    978-1-4244-4638-4
  • Type

    conf

  • DOI
    10.1109/ICMSS.2009.5305221
  • Filename
    5305221