• DocumentCode
    2201646
  • Title

    Zone and resource scheduling in remanufacturing systems

  • Author

    Gharbi, Ali ; Pellerin, Robert ; Villeneuve, Laurent

  • Author_Institution
    Dept. de Genie de la Production Autom., Ecole de Technol. Superieure, Montreal, Que., Canada
  • Volume
    1
  • fYear
    1998
  • fDate
    11-14 Oct 1998
  • Firstpage
    383
  • Abstract
    In remanufacturing projects, work space constraints can limit the simultaneous processing of any pair of jobs requiring the same physical location and often force stronger limitations on the project schedule than precedence constraints. This paper introduces a new priority heuristic rule where the impact of work space constraints is measured in terms of the total minimum remaining project duration. This measure is used to determine the resource allocation at every scheduling decision time point based on the currently active precedence and work space constraints imposed on the schedulable activities. Our experimental results based on a set of 15 real remanufacturing projects shows that the proposed procedure performs better than well reputed heuristic rules.
  • Keywords
    heuristic programming; production control; resource allocation; heuristic rules; priority heuristic rule; project schedule; remanufacturing systems; resource allocation; resource scheduling; simultaneous processing; total minimum remaining project duration; work space constraints; zone scheduling; Aerospace industry; Current measurement; Defense industry; Extraterrestrial measurements; Industrial engineering; Inspection; Job production systems; Job shop scheduling; Resource management; Space technology;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Systems, Man, and Cybernetics, 1998. 1998 IEEE International Conference on
  • ISSN
    1062-922X
  • Print_ISBN
    0-7803-4778-1
  • Type

    conf

  • DOI
    10.1109/ICSMC.1998.725440
  • Filename
    725440