• DocumentCode
    2201872
  • Title

    Distributed scheduling of an assembly shop

  • Author

    Tharumarajah, A. ; Bemelman, R. ; Welgama, P. ; Wells, A.

  • Author_Institution
    CSIRO Manuf. Sci. & Technol., Woodville, SA, Australia
  • Volume
    1
  • fYear
    1998
  • fDate
    11-14 Oct 1998
  • Firstpage
    433
  • Abstract
    Past approaches to solving the assembly scheduling problem have mainly been from the consideration of a hierarchically controlled shop. Thus, the problem is considered in its entirety and solved in a monolithic fashion. However, in recent times, there have been attempts to impose heterarchical or distributed control. The paper extends the work of Welgama (1997) in the area of distributed behaviour-based control and examines the performance of a model based on this for scheduling assembly problems. Using this approach, we investigate the performance of a set of scheduling problems for a 3-stage 4-station assembly problem. This performance is compared with a mixed integer programming (MIP) model of the same situation. The results are promising and show comparative due date and makespan performance.
  • Keywords
    assembling; distributed control; production control; 3-stage 4-station assembly problem; assembly shop; distributed behaviour-based control; distributed scheduling; heterarchical control; mixed integer programming model; Assembly; Australia; Automobiles; Circuit simulation; Circuit testing; Distributed control; Job shop scheduling; Linear programming; Production facilities; Pulp manufacturing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Systems, Man, and Cybernetics, 1998. 1998 IEEE International Conference on
  • ISSN
    1062-922X
  • Print_ISBN
    0-7803-4778-1
  • Type

    conf

  • DOI
    10.1109/ICSMC.1998.725450
  • Filename
    725450