• DocumentCode
    2220101
  • Title

    The Model of Risk Allocation in BOT Expressway Project

  • Author

    Yun, Chen ; Wei, Tang

  • Author_Institution
    Coll. of Traffic & Transp., Changsha Univ. of Sci. & Technol., Changsha
  • Volume
    3
  • fYear
    2008
  • fDate
    19-21 Dec. 2008
  • Firstpage
    283
  • Lastpage
    286
  • Abstract
    In this article the main bodies of risk allocation and the risk factors are analyzed. The risk matrix for participators has been established by using fuzzy and AHP, according to the superior allocation principle, the matrix is solved so that each kind of risk can be determined to most superior undertaker by the Hungarian.
  • Keywords
    decision making; fuzzy set theory; matrix algebra; project management; resource allocation; risk management; road building; transportation; BOT expressway project; construction risk; fuzzy analytical hierarchy process; fuzzy matrix; risk allocation model; Contracts; Educational institutions; Industrial engineering; Information management; Innovation management; Law; Legal factors; Production; Risk analysis; Road transportation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Information Management, Innovation Management and Industrial Engineering, 2008. ICIII '08. International Conference on
  • Conference_Location
    Taipei
  • Print_ISBN
    978-0-7695-3435-0
  • Type

    conf

  • DOI
    10.1109/ICIII.2008.60
  • Filename
    4737776