DocumentCode
2220101
Title
The Model of Risk Allocation in BOT Expressway Project
Author
Yun, Chen ; Wei, Tang
Author_Institution
Coll. of Traffic & Transp., Changsha Univ. of Sci. & Technol., Changsha
Volume
3
fYear
2008
fDate
19-21 Dec. 2008
Firstpage
283
Lastpage
286
Abstract
In this article the main bodies of risk allocation and the risk factors are analyzed. The risk matrix for participators has been established by using fuzzy and AHP, according to the superior allocation principle, the matrix is solved so that each kind of risk can be determined to most superior undertaker by the Hungarian.
Keywords
decision making; fuzzy set theory; matrix algebra; project management; resource allocation; risk management; road building; transportation; BOT expressway project; construction risk; fuzzy analytical hierarchy process; fuzzy matrix; risk allocation model; Contracts; Educational institutions; Industrial engineering; Information management; Innovation management; Law; Legal factors; Production; Risk analysis; Road transportation;
fLanguage
English
Publisher
ieee
Conference_Titel
Information Management, Innovation Management and Industrial Engineering, 2008. ICIII '08. International Conference on
Conference_Location
Taipei
Print_ISBN
978-0-7695-3435-0
Type
conf
DOI
10.1109/ICIII.2008.60
Filename
4737776
Link To Document