• DocumentCode
    2222211
  • Title

    Markov chain approximation to the performance of adaptive CUSUM procedures

  • Author

    Shu, L.J. ; Jiang, W. ; Wu, Z.

  • Author_Institution
    Taipa, Univ. of Macau, Macau, China
  • fYear
    2008
  • fDate
    8-11 Dec. 2008
  • Firstpage
    229
  • Lastpage
    233
  • Abstract
    This paper proposes using a Markovian-type mean estimating procedure in the conventional cumulative sum (CUSUM) control scheme to update its reference value in an adaptive way. This generalizes a class of Markovian adaptive CUSUM (ACUSUM) schemes to achieve the aim of providing an overall good performance over a range of future expected but unknown mean shifts. A comparison of run length performance of the proposed ACUSUM scheme and other control charts is shown favorable to the former.
  • Keywords
    Markov processes; approximation theory; control charts; statistical process control; Markov chain approximation; Markovian adaptive CUSUM scheme; control charts; conventional cumulative sum control chart; statistical process control; Control charts; Equations; Modeling; Monitoring; Performance analysis; Programmable control; Research and development management; Standardization; Statistics; Systems engineering and theory; EWMA; average run length; statistical process control;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Engineering and Engineering Management, 2008. IEEM 2008. IEEE International Conference on
  • Conference_Location
    Singapore
  • Print_ISBN
    978-1-4244-2629-4
  • Electronic_ISBN
    978-1-4244-2630-0
  • Type

    conf

  • DOI
    10.1109/IEEM.2008.4737865
  • Filename
    4737865