Abstract :
LSI Logic Corporation\´s Gresham, OR facility is a 200 mm fab that began production in 1998. This facility currently houses both high-volume production and R&D organizations. In 2001, an executive decision was made to initiate a "stable production" effort in the Gresham facility. This was a result of the impressive performance metrics of LSI Logic\´s Tsukuba fab in Japan that had begun this effort 5 years before. A big part of Tsukuba\´s success was attributable to a WIP (Work-in-Progress) modeling system and the same model was implemented in Gresham. As a requirement, the model developed in Gresham had to be integrated with the rest of the production control systems and adaptable to the diverse mix of products as well as the mix of high-volume production and R&D in Gresham.
Keywords :
integrated circuit manufacture; large scale integration; production control; production facilities; work in progress; 200 mm; Gresham facility; LSI logic; WIP modeling system; production control; Cleaning; Large scale integration; Logic; Measurement; Production control; Production systems; Queueing analysis; Research and development; Semiconductor device modeling; Throughput;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Semiconductor Manufacturing, 2003 IEEE International Symposium on
ISSN :
1523-553X
Print_ISBN :
0-7803-7894-6
Type :
conf
DOI :
10.1109/ISSM.2003.1243285
Filename :
1243285
Link To Document :
بازگشت