• DocumentCode
    2334810
  • Title

    Improvement of Distribution Automation by implementing MasterRTU

  • Author

    Nejad, Samira Bakhtiari ; Najafabadi, Khosro Frarahani

  • Author_Institution
    Dispatching & telemetry Dept., Niroo Res. Inst. (NRI), Tehran, Iran
  • fYear
    2012
  • fDate
    18-20 July 2012
  • Firstpage
    834
  • Lastpage
    837
  • Abstract
    Improving efficiency and reliability of the distribution network remains a critical goal for many utilities. Distribution Automation (DA) optimizes a utility´s operations directly improving the reliability of its distribution power system. Distribution automation was implemented by Great Tehran Electrical Distribution Corporation (GTED Co.). As the demand for electrical is ever increasing, the resulting increase in network complexities demands a higher degree of automation and communication, both for remote control and power system management. In order to monitor and control the automation of new substations the existing infrastructure must be upgraded, which brings about a number of difficulties. To resolve these difficulties the Niroo Research Institute of Iran (NRI) proceeded to design and construct an advanced Remote Terminal Unit (RTU) which can support the installation of new substations by improving data communications with a control center. In this paper we present a solution to improving the automation system of a substation. The overall structure of this RTU implemented by our institute is presented along with a discussion on the methods used to resolve the problems of utilizing such a system.
  • Keywords
    SCADA systems; power distribution control; power distribution reliability; power system management; GTED Co; Great Tehran Electrical Distribution Corporation; MasterRTU; Niroo Research Institute of Iran; SCADA; data communication; distribution automation; distribution network efficiency; distribution network reliability; distribution power system reliability; electrical demand; power system management; remote control; remote terminal unit; substation; Automation; Monitoring; Power system reliability; Protocols; Real-time systems; Reliability; Substations; DNP3.0; IEC60870-5-101; RTU; SCADA; Substation automation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Electronics and Applications (ICIEA), 2012 7th IEEE Conference on
  • Conference_Location
    Singapore
  • Print_ISBN
    978-1-4577-2118-2
  • Type

    conf

  • DOI
    10.1109/ICIEA.2012.6360840
  • Filename
    6360840