DocumentCode
2337589
Title
Analysis of contingencies considering the new 400 kV axle administrated by Timisoara transmission branch
Author
Pop, D.M. ; Ardelean, IIie ; Chiosa, Nicolae ; Kilyeni, Stefan ; Vuc, Gheorghe ; Barbulescu, Constanin
Author_Institution
CNTEE Transelectrica SA, Transm. Branch Timisoara, Timisoara
fYear
2008
fDate
25-27 May 2008
Firstpage
560
Lastpage
563
Abstract
The paper presents the modifications made in comparison with the actual functioning pattern which is part of the subsystem in the Western and South-Western area of the Romanian power system, the Winter-Evening-Peak regime. The 400 kV electrical line Portile de Fier-Resita was introduced, the transition of the electrical lines Resita-Timisoara and Timisoara-Sacalaz-Arad from 220 kV to 400 kV was made; these lines previously operated as 220 kV lines. The 400 kV electrical lines Oradea-Nadab-Bekescsba and Arad-Nadab-Bekescsaba were also introduced to. We tried to identify a series of specific regimes which are representative for the problems raised by the reactive power flow and by the voltage level. Simple contingencies of N-1 type referring to all elements of the power system for the basic regime have been analyzed as well as double contingencies of N-2 type.
Keywords
axles; load flow; power transmission; reactive power; Arad-Nadab-Bekescsaba; Oradea-Nadab-Bekescsba; Romanian power system; Timisoara transmission branch; Timisoara-Sacalaz-Arad; Winter-Evening-Peak regime; electrical line Portile de Fier-Resita; reactive power flow; voltage 400 V; voltage level; Axles; Decision support systems; Power engineering; 220 and 400 kV electrical overhead lines; contingencies; power systems;
fLanguage
English
Publisher
ieee
Conference_Titel
Human System Interactions, 2008 Conference on
Conference_Location
Krakow
Print_ISBN
978-1-4244-1542-7
Electronic_ISBN
978-1-4244-1543-4
Type
conf
DOI
10.1109/HSI.2008.4581501
Filename
4581501