• DocumentCode
    2390144
  • Title

    Integration of renewable resources: Updated analysis of operational requirements and assessment of generation fleet capability under a 20% RPS requirement

  • Author

    Helman, Udi ; Loutan, Clyde ; Rosenblum, Grant ; Guo, Tao ; Toolson, Eric ; Hobbs, Benjamin

  • fYear
    2010
  • fDate
    25-29 July 2010
  • Firstpage
    1
  • Lastpage
    2
  • Abstract
    This paper presents updated results from a Monte Carlo simulation method of operational needs created by variable generation renewables coupled with a Production Simulation methodology to assess whether the California ISO´s existing generation fleet can provide the needed flexibility for ramping, load following and Regulation under a 20% Renewable Portfolio Standard. The production simulation methodology utilizes stochastic simulations of load and wind forecast errors and covers a wide range of operating scenarios.
  • Keywords
    ISO standards; Monte Carlo methods; load forecasting; power system simulation; wind power; California ISO; Monte Carlo simulation; RPS requirement; generation fleet capability assessment; load forecast error; operational requirements; ramping; renewable portfolio standard; renewable resources; stochastic simulations; variable generation renewables; wind forecast error;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power and Energy Society General Meeting, 2010 IEEE
  • Conference_Location
    Minneapolis, MN
  • ISSN
    1944-9925
  • Print_ISBN
    978-1-4244-6549-1
  • Electronic_ISBN
    1944-9925
  • Type

    conf

  • DOI
    10.1109/PES.2010.5590171
  • Filename
    5590171