• DocumentCode
    239298
  • Title

    Yard crane dispatching to minimize vessel turnaround times in container terminals

  • Author

    Shell Ying Huang ; Ya Li ; Xi Guo

  • Author_Institution
    Sch. of Comput. Eng., Nanyang Technol. Univ., Singapore, Singapore
  • fYear
    2014
  • fDate
    7-10 Dec. 2014
  • Firstpage
    1747
  • Lastpage
    1758
  • Abstract
    Yard crane (YC) dispatching in the operational planning of container terminals usually aims to minimize makespan of YC operations or waiting time of vehicles. We propose that minimizing the maximum tardiness of vehicle jobs at yard blocks will minimize the operational delay of the longest quay crane (QC). This will minimize vessel turnaround time which is one of the most important objectives of container terminals. A provably optimal algorithm, MMT-RBA* to minimize maximum job tardiness, is presented to sequence the YC jobs. Jobs requiring reshuffling of other containers, often ignored in other studies, are handled by embedded simulation in our optimization algorithms. Another provably optimal algorithm, MMS-RBA* to minimize makespan, is also presented. Simulation experiments confirm that MMT-RBA* significantly outperforms the optimal algorithm RBA* to minimize vehicle waiting time from earlier studies and MMS-RBA* to minimize makespan in minimizing vessel turnaround time.
  • Keywords
    cranes; dispatching; minimisation; scheduling; sea ports; MMS-RBA; MMT-RBA; container terminal; makespan minimization; maximum job tardiness; operational planning; optimization algorithm; quay crane; vessel turnaround times; yard crane dispatching; Containers; Cranes; Delays; Dispatching; Loading; Planning; Vehicles;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Simulation Conference (WSC), 2014 Winter
  • Conference_Location
    Savanah, GA
  • Print_ISBN
    978-1-4799-7484-9
  • Type

    conf

  • DOI
    10.1109/WSC.2014.7020024
  • Filename
    7020024