• DocumentCode
    2396020
  • Title

    Building IT infrastructure to bid generation in ERCOT

  • Author

    Miller, Gary ; Gurley, Larry

  • Author_Institution
    Texas Univ., Dallas, TX, USA
  • Volume
    3
  • fYear
    2002
  • fDate
    25-25 July 2002
  • Abstract
    Summary form only given, as follows. In the past, a generating utility had time to study the generation scheduling and pricing problem at a comparative leisurely pace. To meet the daily bidding deadline in ERCOT, TXU (USA) built a sophisticated IT infrastructure to automatically gather data (load forecasts, fuel costs, heat rates, etc.) for generation scheduling, bidding, and settlement. This paper describes the IT infrastructure that they built to bid generation in ERCOT and share their deployment experience.
  • Keywords
    power engineering computing; power generation economics; power generation planning; power generation scheduling; tariffs; ERCOT; IT infrastructure; TXU; USA; automatic data gathering; daily bidding deadline; generation pricing; generation scheduling; Costs; Fuels; Load forecasting; Pricing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power Engineering Society Summer Meeting, 2002 IEEE
  • Conference_Location
    Chicago, IL, USA
  • Print_ISBN
    0-7803-7518-1
  • Type

    conf

  • DOI
    10.1109/PESS.2002.1043572
  • Filename
    1043572