DocumentCode :
2396945
Title :
Hydropower unit start-up costs
Author :
Bakken, Bjørn H. ; Bjørkvoll, Thor
Author_Institution :
Energy Res., SINTEF, Trondheim, Norway
Volume :
3
fYear :
2002
fDate :
25-25 July 2002
Firstpage :
1522
Abstract :
This paper presents a model for calculation of hydropower generator start-up costs. All start-up costs are assumed to be either directly proportional to the number of starts or increasing with the number of operating hours of the unit. The model takes into account both the direct start-up cost and the effect on the unit´s refurbishment intervals. As each start is assumed to cause abrasion equivalent to a certain number of operating hours, additional costs are incurred as each start reduces the remaining service life of the unit and thus shift the refurbishment intervals closer in time. Introducing a revenue function depending on the number of start-ups in a given period, optimal combinations of start-up rates and service intervals are calculated.
Keywords :
costing; hydroelectric generators; power generation economics; starting; abrasion equivalent; hydropower generator; hydropower unit start-up costs; operating hours; refurbishment; refurbishment intervals; remaining service life reduction; Control equipment; Costs; Degradation; Electric breakdown; Fluctuations; Hydroelectric power generation; Insulation; Power systems; Thermal loading; Valves;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power Engineering Society Summer Meeting, 2002 IEEE
Conference_Location :
Chicago, IL, USA
Print_ISBN :
0-7803-7518-1
Type :
conf
DOI :
10.1109/PESS.2002.1043646
Filename :
1043646
Link To Document :
بازگشت