• DocumentCode
    2396945
  • Title

    Hydropower unit start-up costs

  • Author

    Bakken, Bjørn H. ; Bjørkvoll, Thor

  • Author_Institution
    Energy Res., SINTEF, Trondheim, Norway
  • Volume
    3
  • fYear
    2002
  • fDate
    25-25 July 2002
  • Firstpage
    1522
  • Abstract
    This paper presents a model for calculation of hydropower generator start-up costs. All start-up costs are assumed to be either directly proportional to the number of starts or increasing with the number of operating hours of the unit. The model takes into account both the direct start-up cost and the effect on the unit´s refurbishment intervals. As each start is assumed to cause abrasion equivalent to a certain number of operating hours, additional costs are incurred as each start reduces the remaining service life of the unit and thus shift the refurbishment intervals closer in time. Introducing a revenue function depending on the number of start-ups in a given period, optimal combinations of start-up rates and service intervals are calculated.
  • Keywords
    costing; hydroelectric generators; power generation economics; starting; abrasion equivalent; hydropower generator; hydropower unit start-up costs; operating hours; refurbishment; refurbishment intervals; remaining service life reduction; Control equipment; Costs; Degradation; Electric breakdown; Fluctuations; Hydroelectric power generation; Insulation; Power systems; Thermal loading; Valves;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power Engineering Society Summer Meeting, 2002 IEEE
  • Conference_Location
    Chicago, IL, USA
  • Print_ISBN
    0-7803-7518-1
  • Type

    conf

  • DOI
    10.1109/PESS.2002.1043646
  • Filename
    1043646