DocumentCode
2396945
Title
Hydropower unit start-up costs
Author
Bakken, Bjørn H. ; Bjørkvoll, Thor
Author_Institution
Energy Res., SINTEF, Trondheim, Norway
Volume
3
fYear
2002
fDate
25-25 July 2002
Firstpage
1522
Abstract
This paper presents a model for calculation of hydropower generator start-up costs. All start-up costs are assumed to be either directly proportional to the number of starts or increasing with the number of operating hours of the unit. The model takes into account both the direct start-up cost and the effect on the unit´s refurbishment intervals. As each start is assumed to cause abrasion equivalent to a certain number of operating hours, additional costs are incurred as each start reduces the remaining service life of the unit and thus shift the refurbishment intervals closer in time. Introducing a revenue function depending on the number of start-ups in a given period, optimal combinations of start-up rates and service intervals are calculated.
Keywords
costing; hydroelectric generators; power generation economics; starting; abrasion equivalent; hydropower generator; hydropower unit start-up costs; operating hours; refurbishment; refurbishment intervals; remaining service life reduction; Control equipment; Costs; Degradation; Electric breakdown; Fluctuations; Hydroelectric power generation; Insulation; Power systems; Thermal loading; Valves;
fLanguage
English
Publisher
ieee
Conference_Titel
Power Engineering Society Summer Meeting, 2002 IEEE
Conference_Location
Chicago, IL, USA
Print_ISBN
0-7803-7518-1
Type
conf
DOI
10.1109/PESS.2002.1043646
Filename
1043646
Link To Document