DocumentCode :
2436429
Title :
Research on Innovation Relay Centre structure model of risk factors
Author :
Shanyong, Qin ; Yijie, Bian ; Jitao, Guo ; Minwei, Liu
Author_Institution :
Bus. Sch., Hohai Univ., Nanjing, China
fYear :
2011
fDate :
8-11 Jan. 2011
Firstpage :
414
Lastpage :
418
Abstract :
Innovation Relay Centre(IRC) is a successful technology transfer network for small and medium-sized enterprises (SMEs). IRC shows many brand-new characteristics of intermediary transfer organizations, and simultaneously increases many new risks. From the view of risk management, the paper comprehensively analyzed the risk factors which affected the IRC operation through factor analysis technology, and obtained environmental risk, technology risk, management risk, financial risk and project selection risk. In order to further confirm the relationship between IRC risk factors and IRC performance factors, the study carried on the regression analysis between the five dimensions and the IRC performance factors. This paper finally summarized the risk factors´ influence to IRC, and provided a theoretical guidance to prevent and control the IRC risks.
Keywords :
innovation management; regression analysis; risk management; small-to-medium enterprises; IRC structure model; environmental risk; factor analysis technology; financial risk; innovation relay centre; management risk; project selection risk; regression analysis; risk factors; risk management; small-and-medium sized enterprises; technology risk; technology transfer network; Organizations; Principal component analysis; Relays; Reliability; Risk management; Technological innovation; Technology transfer; IRC; factor analysis; regression analysis; risk management;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Management Science and Industrial Engineering (MSIE), 2011 International Conference on
Conference_Location :
Harbin
Print_ISBN :
978-1-4244-8383-9
Type :
conf
DOI :
10.1109/MSIE.2011.5707751
Filename :
5707751
Link To Document :
بازگشت