DocumentCode :
2451586
Title :
Scheduling requirements for hot charge optimization in an integrated steel plant
Author :
Knoop, Peter ; Van Nerom, Luc
Author_Institution :
A.I. Syst., Brussels, Belgium
Volume :
1
fYear :
2003
fDate :
12-16 Oct. 2003
Firstpage :
74
Abstract :
Direct and indirect hot charging of slabs to the reheating furnaces of the hot strip mill results in an important productivity gain, reduced inventory and slab handling and an important energy consumption reduction. This paper describes the logistics of hot charging and its challenging scheduling and control requirements. It also proposes the software system SteelPlanner, a scheduling solution where different process specific and automated scheduling components collaborate to optimize the hot charging problem. The paper is based on a hot connect implementation at Voest Alpine Stahl Linz in Austria.
Keywords :
furnaces; hot rolling; power consumption; production engineering computing; rolling mills; scheduling; steel industry; stock control; Austria; SteelPlanner software system; Voest Alpine Stahl Linz; automated scheduling components; continuous caster; direct hot charging; energy consumption reduction; hot charge optimization; hot charging problem; hot strip mill; indirect hot charging; integrated steel plant; productivity gain; reduced inventory; reheating furnaces; scheduling requirements; scheduling solution; slab handling; Automatic control; Energy consumption; Furnaces; Logistics; Milling machines; Productivity; Slabs; Software systems; Steel; Strips;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industry Applications Conference, 2003. 38th IAS Annual Meeting. Conference Record of the
Print_ISBN :
0-7803-7883-0
Type :
conf
DOI :
10.1109/IAS.2003.1257486
Filename :
1257486
Link To Document :
بازگشت