DocumentCode :
2455269
Title :
Analysis on mechanical characters of long span continuous bridge pier in cut jacking construction
Author :
Yan, Xing-fei ; Nian, Fu-long ; Wang, Luo-ying ; Li, Fang-yuan
Author_Institution :
Div. of Road & Bridge, Shanghai Urban Constr. Design & Res. Inst., Shanghai, China
fYear :
2011
fDate :
24-26 June 2011
Firstpage :
3846
Lastpage :
3849
Abstract :
As the longest span concrete bridge to be jacked up in China, this paper introduced the whole jacking plan for the long span continuous bridge in detail, presented the key mechanical characters in the construction stage when cut the main piers, suggested the measure to reduce the cracking stress to insure the safety.
Keywords :
bridges (structures); cracks; cutting; structural engineering; China; cracking stress reduction; cut jacking construction; jacking planning; long span continuous bridge pier; Bridges; Concrete; Lifting equipment; Roads; Safety; Stress measurement; construction stage; cracking; cutting; jack up; long span continuous bridge;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Remote Sensing, Environment and Transportation Engineering (RSETE), 2011 International Conference on
Conference_Location :
Nanjing
Print_ISBN :
978-1-4244-9172-8
Type :
conf
DOI :
10.1109/RSETE.2011.5965078
Filename :
5965078
Link To Document :
بازگشت