Fluvial morphology analysis of the Yichang navigation channel after the TGP operation
Author :
Liu, Huaixiang ; Lu, Yongjun
Author_Institution :
State Key Lab. of Hydrol.-Water Resources & Hydraulic Eng., Nanjing Hydraulic Res. Inst., Nanjing, China
fYear :
2011
fDate :
24-26 June 2011
Firstpage :
4063
Lastpage :
4066
Abstract :
Since 2003, the operation of the Three Gorges project (TGP) has obviously decreased sediment transportation into the downstream Yichang navigation channel. Therefore the erosion & incision of this channel and the deterioration of navigation condition can be expected. A fluvial morphology analysis of Yichang channel was given in this study and the results showed that: the main erosion zone has moved downwards during 2003~2006 so that the roughness coefficient in the near-dam section has increased more than 30%. The riverbed armoring calculation methods based on incipient possibility rather than those based on incipient velocity/grain size were also suggested in this channel for prediction of size distribution.
Keywords :
erosion; geographic information systems; geomorphology; grain size; sedimentation; sediments; China; TGP operation; Three Gorges project; Yichang navigation channel; fluvial morphology analysis; grain size; incipient velocity; main erosion zone; navigation condition; near-dam section; riverbed armoring calculation; roughness coefficient; sediment transportation; Electronic mail; Grain size; Laboratories; Morphology; Navigation; Sediments; Transportation; Three Gorges; fluvial morphology; navigation channel;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Remote Sensing, Environment and Transportation Engineering (RSETE), 2011 International Conference on
Conference_Location :
Nanjing
Print_ISBN :
978-1-4244-9172-8
Type :
conf
DOI :
10.1109/RSETE.2011.5965212
Filename :
5965212
Link To Document :
بازگشت