DocumentCode :
2461916
Title :
Economic short term scheduling for a run-of-river-plant chain by combined LP and genetic optimization
Author :
Hülsemann, Matthias ; Müller, Herbert ; Wetzlinger, Herwig
Author_Institution :
Landis & Gyr, Austria
fYear :
1996
fDate :
16-18 Apr 1996
Firstpage :
42
Lastpage :
46
Abstract :
A simulation and optimization tool for daily operation planning of a cascaded hydro electric power plant system is proposed in the paper. To maximize the value of (weighted) energy generation subject to imposed constraints the optimal water release schedule is refined in a functional hierarchy down from a several days scope to a four hours horizon. A two-step-concept is chosen: coarse pre-optimization by linear programming, followed by a detailed optimizing search procedure, for which a self-adjusting genetic algorithm was designed. An inherent and essential part of this approach is the developed (fully) nonlinear, dynamic simulation model. Test case results and obtained performance improvements versus current scheduling practice are reported
Keywords :
hydroelectric power stations; Draukraft hydro system; cascaded hydro electric power plant system; daily operation planning; dynamic simulation model; economic short term scheduling; genetic optimization; linear programming; optimization tool; optimizing search procedure; run-of-river-plant chain; self adjusting genetic algorithm; simulation tool;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Power System Control and Management, Fourth International Conference on (Conf. Publ. No. 421)
Conference_Location :
London
ISSN :
0537-9989
Print_ISBN :
0-85296-653-9
Type :
conf
DOI :
10.1049/cp:19960234
Filename :
637756
Link To Document :
بازگشت