Title :
Harbin metro interval monitoring results and data analysis
Author :
Wang, Xiaohui ; Zhang, Yin ; Lu, Junlong
Author_Institution :
Coll. of Civil Eng., Xi´´an Univ. of Archit. & Technol., Xi´´an, China
Abstract :
Metro amount of ground during excavation and tunnel crown settlement and the amount of physical and mechanical properties of overburden, overburden thickness, and the excavation of the upper surface of the shape of the load, and many other factors. In this paper, the monitoring of land subsidence subway, on the subway excavation of ground observation data analysis, the results show that the surface deformation monitoring points with regularity.
Keywords :
condition monitoring; construction; data analysis; geotechnical engineering; tunnels; Harbin metro interval monitoring; data analysis; excavation; land subsidence subway; overburden thickness; physical-mechanical properties; surface deformation monitoring points; tunnel crown settlement; Civil engineering; Computational modeling; Data analysis; Educational institutions; Monitoring; Robustness; Tunneling; data analysis; excavation interval; monitoring results; subway;
Conference_Titel :
Remote Sensing, Environment and Transportation Engineering (RSETE), 2011 International Conference on
Conference_Location :
Nanjing
Print_ISBN :
978-1-4244-9172-8
DOI :
10.1109/RSETE.2011.5965439