• DocumentCode
    2467001
  • Title

    Enhancing the asset management process for new demands of decentralized energy integration

  • Author

    Jendernalik, Lars ; Mensmann, Christian ; Giavarra, Dominique

  • Author_Institution
    Westnetz GmbH, Germany
  • fYear
    213
  • fDate
    10-13 June 213
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    The "Energiewende" in Germany and resulting legal requirements lead to a dynamic increase of decentralized energy generation and the essential network integration. The power distribution system represents the central hub between decentralized energy resources and load customers. German distribution system operators are obliged to immediate network extension in order to take up the decentralized energy in total and to ensure the complete network integration. The resulting demands for distribution system operators are dealing with even more than technical issues and will be discussed in the following.
  • Keywords
    asset management; distributed power generation; distribution networks; power system management; Energiewende; German distribution system operators; asset management process; central hub; decentralized energy generation; decentralized energy integration; decentralized energy resources; load customers; network integration; power distribution system;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Electricity Distribution (CIRED 2013), 22nd International Conference and Exhibition on
  • Conference_Location
    Stockholm
  • Electronic_ISBN
    978-1-84919-732-8
  • Type

    conf

  • DOI
    10.1049/cp.2013.0590
  • Filename
    6683193