DocumentCode
2477182
Title
Initial assessment of the asset management process of a large industrial plant including probabilistic reliability analysis
Author
Schwan, Michael ; Khaliq, Imran ; Khan, Sharifullah ; Ettinger, Andreas
Author_Institution
Siemens AG, Munich, Germany
fYear
213
fDate
10-13 June 213
Firstpage
1
Lastpage
4
Abstract
Engro Fertilizer and Siemens PTI jointly completed a study on the supply reliability situation and on the asset management process in Engro Fertilizer´s Daharki (Pakistan) plant. This project complemented earlier projects on, e.g., the overall design and the dynamic performance of the captive generation units in this industrial power supply system. Probabilistic reliability calculations validated that the reliability level throughout the plant is adequate and rather constant. A few individual exceptions are well-known to the operators and covered by explicit processes and measures. Also the asset management process was reviewed from the perspective of the plant´s overall reliability performance, and the development plans existing with Engro Fertilizer were confirmed. For certain individual assets or groups of assets, the investigations indicated the need for faster implementation in order to maintain the required risk levels for the plant´s operation.
Keywords
asset management; industrial plants; probability; reliability; Engro Fertilizer Daharki plant; Pakistan; Siemens PTI; asset management process; industrial plants; industrial power supply system; probabilistic reliability analysis; risk levels;
fLanguage
English
Publisher
iet
Conference_Titel
Electricity Distribution (CIRED 2013), 22nd International Conference and Exhibition on
Conference_Location
Stockholm
Electronic_ISBN
978-1-84919-732-8
Type
conf
DOI
10.1049/cp.2013.1074
Filename
6683677
Link To Document