• DocumentCode
    2477182
  • Title

    Initial assessment of the asset management process of a large industrial plant including probabilistic reliability analysis

  • Author

    Schwan, Michael ; Khaliq, Imran ; Khan, Sharifullah ; Ettinger, Andreas

  • Author_Institution
    Siemens AG, Munich, Germany
  • fYear
    213
  • fDate
    10-13 June 213
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    Engro Fertilizer and Siemens PTI jointly completed a study on the supply reliability situation and on the asset management process in Engro Fertilizer´s Daharki (Pakistan) plant. This project complemented earlier projects on, e.g., the overall design and the dynamic performance of the captive generation units in this industrial power supply system. Probabilistic reliability calculations validated that the reliability level throughout the plant is adequate and rather constant. A few individual exceptions are well-known to the operators and covered by explicit processes and measures. Also the asset management process was reviewed from the perspective of the plant´s overall reliability performance, and the development plans existing with Engro Fertilizer were confirmed. For certain individual assets or groups of assets, the investigations indicated the need for faster implementation in order to maintain the required risk levels for the plant´s operation.
  • Keywords
    asset management; industrial plants; probability; reliability; Engro Fertilizer Daharki plant; Pakistan; Siemens PTI; asset management process; industrial plants; industrial power supply system; probabilistic reliability analysis; risk levels;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Electricity Distribution (CIRED 2013), 22nd International Conference and Exhibition on
  • Conference_Location
    Stockholm
  • Electronic_ISBN
    978-1-84919-732-8
  • Type

    conf

  • DOI
    10.1049/cp.2013.1074
  • Filename
    6683677