DocumentCode
2502005
Title
A class of scheduling problem with chains constrains and processing times constrained by a resource
Author
Yang Yan ; Hongfeng Wang ; Dingwei Wang ; Dazhi Wang
Author_Institution
Northeastern Univ., Shenyang
fYear
2008
fDate
25-27 June 2008
Firstpage
9111
Lastpage
9114
Abstract
In this paper, a class of single machine resource constrained scheduling problem is investigated. In this model, it is assumed that the jobs are subject to parallel chains precedence constrains. The objective is total weighted completion times. Two versions of problem are addressed. In the first one the chains canpsilat be interrupted, whereas in the second one the chains can be interrupted. For both cases, polynomial algorithms are presented, respectively. We also give an example to illustrate the feasibility of the algorithm.
Keywords
polynomials; single machine scheduling; parallel chains precedence constrains; polynomial algorithms; processing times; single machine resource constrained scheduling problem; total weighted completion times; Artificial neural networks; Automation; Electronic mail; Gold; Intelligent control; Polynomials; Single machine scheduling; algorithm; chain precedence constrains; resource constrains; scheduling;
fLanguage
English
Publisher
ieee
Conference_Titel
Intelligent Control and Automation, 2008. WCICA 2008. 7th World Congress on
Conference_Location
Chongqing
Print_ISBN
978-1-4244-2113-8
Type
conf
DOI
10.1109/WCICA.2008.4594370
Filename
4594370
Link To Document