DocumentCode :
2516181
Title :
Research on SMMEs´ planning and scheduling
Author :
Meirong, Xu ; Rongxia, Qu
Author_Institution :
Key Lab. of Integrated Autom. of Process Ind., Northeastern Univ., Shenyang, China
fYear :
2011
fDate :
23-25 May 2011
Firstpage :
1624
Lastpage :
1628
Abstract :
On the background of ERP system, aiming at the multi-variety and small-batch production in SMME, the planning and scheduling problems were analyzed. The tasks, resources and constraints were introduced firstly, and then a closed-loop frame was provided to eliminate the conflicts, at the same time, the heuristic algorithm was introduced to get the appointed list. The results showed that this method could improve the veracity and equilibrium of planning and scheduling problems of work shop.
Keywords :
enterprise resource planning; machinery production industries; production planning; scheduling; small-to-medium enterprises; ERP system; SMME; closed-loop frame; heuristic algorithm; multivariety production; planning problem; scheduling problem; small-and-medium machinery enterprises; small-batch production; Finishing; Job shop scheduling; Materials requirements planning; Planning; Raw materials; SMME; heuristic algorithm; loop-closed scheduling; planning and scheduling;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Control and Decision Conference (CCDC), 2011 Chinese
Conference_Location :
Mianyang
Print_ISBN :
978-1-4244-8737-0
Type :
conf
DOI :
10.1109/CCDC.2011.5968453
Filename :
5968453
Link To Document :
بازگشت