• DocumentCode
    2525807
  • Title

    Raise of effectiveness of repairs planning of an electronetwork equipment

  • Author

    Levin, V.M. ; Ujencev, D.

  • Author_Institution
    Novosibirsk State Tech. Univ., Russia
  • Volume
    2
  • fYear
    1999
  • fDate
    1999
  • Firstpage
    772
  • Abstract
    Operating a normative system of planned preventive repairs (PPR) with positive qualities has a series of shortages, the principal of which is the unreasonable overestimate of the volumes of fulfilled repair work and magnitudes of repair fund of the firm. The alternative of PPR is the repair on the real technical state of equipment (RTS), at which are assigned defined periodicity and volume of diagnostic check, the overhaul resource of equipment and volume of repair work on elimination of detected problems
  • Keywords
    maintenance engineering; planning; power apparatus; Russian power engineering; detected problems elimination; diagnostic check; electronetwork equipment; overhaul resource; planned preventive repairs; real technical state of equipment; repair fund; repair work; repairs planning; Computer crashes; Costs; Electric variables measurement; Information security; Life testing; Manufacturing automation; Qualifications; Substations; Voltage; Volume measurement;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Science and Technology, 1999. KORUS '99. Proceedings. The Third Russian-Korean International Symposium on
  • Conference_Location
    Novosibirsk
  • Print_ISBN
    0-7803-5729-9
  • Type

    conf

  • DOI
    10.1109/KORUS.1999.876279
  • Filename
    876279