DocumentCode
2528072
Title
Improved pre-prepared power demand table with Muller method for solving Profit Based Unit Commitment
Author
Chandram, K. ; Subrahmanyam, N. ; Sydulu, M.
Author_Institution
Dept. of Electr. Eng., Nat. Inst. of Technol., Warangal
fYear
2008
fDate
19-21 Nov. 2008
Firstpage
1
Lastpage
6
Abstract
This paper presents a new approach with muller method for solving profit based unit commitment (PBUC). In Deregulated environment, the generation companies (GENCOs) schedule their generators to maximize their profit rather than satisfying the power demand. The PBUC problem is solved by the proposed approach in two stages. Initially, the information of committed units is obtained by a simple approach and finally non linear programming sub problem of economic dispatch is solved by Muller method. The proposed approach has been tested on a power system with 3 and 10 generating units. Simulation results of the proposed approach have been compared with existing methods and also with traditional unit commitment. It is observed from the simulation results that the proposed algorithm provides maximum profit with less computational time compared to existing methods.
Keywords
nonlinear programming; power generation dispatch; power generation economics; power generation scheduling; profitability; Muller method; economic dispatch; generation companies schedule; nonlinear programming; power system; preprepared power demand table; profit based unit commitment; Computational modeling; Cost function; Dynamic programming; Fuels; Load forecasting; Power demand; Power generation; Power generation economics; Power system simulation; Power systems; Muller method and Deregulation; Profit based unit commitment;
fLanguage
English
Publisher
ieee
Conference_Titel
TENCON 2008 - 2008 IEEE Region 10 Conference
Conference_Location
Hyderabad
Print_ISBN
978-1-4244-2408-5
Electronic_ISBN
978-1-4244-2409-2
Type
conf
DOI
10.1109/TENCON.2008.4766599
Filename
4766599
Link To Document