DocumentCode
2530482
Title
Using of evolving cellular automata for flexible job shop with makespan criterion
Author
Antczak, A. ; Antczak, P. ; Witkowski, T.
Author_Institution
Warsaw Univ. of Technol., Warsaw, Poland
fYear
2009
fDate
21-23 Sept. 2009
Firstpage
297
Lastpage
302
Abstract
The paper presents evolving cellular automata-based scheduling production. The models have been implemented and tested, and the examples have been illustrated. The software of this model, allows us to analyze the process of construction schedule for many variants reflecting a variety of combinations other factors. The results indicate that the proposed algorithm is an efficient approach to solve FJSP.
Keywords
cellular automata; job shop scheduling; production engineering computing; FJSP; cellular automata; flexible job-shop scheduling problem; makespan criterion; production scheduling; Conferences; Data acquisition; Genetic programming; Job production systems; Job shop scheduling; Manufacturing industries; Paper technology; Processor scheduling; Scheduling algorithm; Testing; Evolving cellular automata; production scheduling;
fLanguage
English
Publisher
ieee
Conference_Titel
Intelligent Data Acquisition and Advanced Computing Systems: Technology and Applications, 2009. IDAACS 2009. IEEE International Workshop on
Conference_Location
Rende
Print_ISBN
978-1-4244-4901-9
Electronic_ISBN
978-1-4244-4882-1
Type
conf
DOI
10.1109/IDAACS.2009.5342977
Filename
5342977
Link To Document