• DocumentCode
    2539455
  • Title

    Improving the manufacturing test interval and costs for telecommunication equipment

  • Author

    Jain, Aridaman K. ; Saraidaridis, Charalampos I.

  • Author_Institution
    Lucent Technol., AT&T Bell Labs., Holmdel, NJ, USA
  • fYear
    1999
  • fDate
    18 -21 Jan 1999
  • Firstpage
    410
  • Lastpage
    417
  • Abstract
    Generally, most circuit packs of telecommunication systems are processed through a manufacturing test process that may include in-circuit test, functional test, factory environmental stress testing or environmental stress screening (ESS), and system tests. Some of these tests, like ESS, may also be due to customer or Bellcore requirements. However, it is both expensive and time consuming to process all production circuit packs through all these tests, particularly when the test yields in some of these tests are close to 100 percent, and the field reliability performance is much better than expected. In this paper, we describe an approach for developing sampling plans for performing these tests. We feel that this approach of using production sampling plans in manufacturing coupled with statistical analysis of factory test yield and field reliability data to identify the best circuit pack candidates, can be applied to any large production volume telecommunication system for reducing both the manufacturing test interval and costs
  • Keywords
    environmental stress screening; life testing; product development; quality control; telecommunication equipment testing; environmental stress screening; factory environmental stress testing; factory test yield; field reliability data; field reliability performance; functional test; in-circuit test; manufacturing test costs; manufacturing test interval; product assurance; production circuit packs; production sampling plans; quality assurance; statistical analysis; system tests; telecommunication equipment; Circuit testing; Costs; Electronic switching systems; Manufacturing processes; Performance evaluation; Production facilities; Production systems; Sampling methods; Stress; System testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Reliability and Maintainability Symposium, 1999. Proceedings. Annual
  • Conference_Location
    Washington, DC
  • Print_ISBN
    0-7803-5143-6
  • Type

    conf

  • DOI
    10.1109/RAMS.1999.744152
  • Filename
    744152