The right use of “with and without antitheses” in the post evaluation of construction projects —Using Lianxu speedway project as an example
Author :
Wang Ying ; Liu Sifeng ; Wu Hecheng
Author_Institution :
Nanjing Univ. of Aeronaut. & Astronaut., Nanjing
fYear :
2007
fDate :
7-10 Oct. 2007
Firstpage :
2165
Lastpage :
2169
Abstract :
More and more importance is attached to the post evaluation of the constructing projects. Traditional "with and without antitheses" is a commonly used method in post evaluation, which is biased and insufficient in practical use and needs to be improved. Using Lianxu speedway project as an example, traditional and improved "with and without antitheses" are used respectively to evaluate the impact of this project on the economic growth of circumjacent area. It is concluded through contrastive analysis that the improved "with and without antitheses" is a new idea of using this antithesis, which better modifies the bias and insufficiency of the traditional method and provides reference for the post evaluation of the following projects.
Keywords :
PERT; civil engineering; road building; Lianxu speedway project; construction projects; economic growth; project post evaluation; with and without antitheses; Cities and towns; Decision making; Design engineering; Economic indicators; Educational programs; Investments; Job design; Project management; Systems engineering and theory; Technological innovation;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Systems, Man and Cybernetics, 2007. ISIC. IEEE International Conference on
Conference_Location :
Montreal, Que.
Print_ISBN :
978-1-4244-0990-7
Electronic_ISBN :
978-1-4244-0991-4
Type :
conf
DOI :
10.1109/ICSMC.2007.4413631
Filename :
4413631
Link To Document :
بازگشت