Abstract :
In the Quay Crane Scheduling Problem (QCSP) a set of loading/unloading ship tasks for a vessel are dispatching to a set of assigned QCs. Every task must be processed once by a QC while a QC can process at most one task at a time. A solution to the problem, called a QC schedule, which define starting time for every task on a crane. A polynomial time heuristic is proposed for Quay Crane Scheduling Problem (QCSP) at container terminal in this paper. The objective is to minimize the total handle time of all tasks while both Quay Crane (QC) moving time and interference constraints are considered. The concept of contiguous bay operation and the decomposition of QC operating time are considered by the heuristic to generate QC schedule.
Keywords :
cranes; polynomials; scheduling; sea ports; QC operating time decomposition; container terminal; contiguous bay operation; heuristic algorithm; interference constraints; loading-unloading ship tasks; polynomial time heuristic; quay crane scheduling problem; vessel; Containers; Cranes; Indexes; Interference constraints; Safety; Schedules; Scheduling; Container terminal operation; Heuristic; Quay crane scheduling;
Conference_Titel :
Fuzzy Systems and Knowledge Discovery (FSKD), 2012 9th International Conference on
Conference_Location :
Sichuan
Print_ISBN :
978-1-4673-0025-4
DOI :
10.1109/FSKD.2012.6233825