DocumentCode
2550174
Title
Turkish Aerospace Industries Inc. ANKA Unmanned Aerial vehicle system
Author
Okuyan, E.
fYear
2012
fDate
14-18 Oct. 2012
Firstpage
1
Lastpage
19
Abstract
This paper is about the earliest deadline first scheduling algorithm and its use in ANKA UAV software. EDFS is one of the well-known scheduling algorithms because it is highly efficient and easy to maintain. In this study, slotted EDFS algorithm is successfully used in periodic job scheduling and serial IO scheduling in ANKA UAV software.
Keywords
aerospace components; aerospace industry; autonomous aerial vehicles; military aircraft; object tracking; scheduling; surveillance; ANKA UAV software; ANKA unmanned aerial vehicle system; EDFS; MALE class UAV; Turkish aerospace industries inc; day and night real-time intelligence; earliest deadline first scheduling algorithm; fuselage length; line of sight; periodic job scheduling; serial IO scheduling; slotted EDFS algorithm; surveillance; target acquisition; wing span ATOLS;
fLanguage
English
Publisher
ieee
Conference_Titel
Digital Avionics Systems Conference (DASC), 2012 IEEE/AIAA 31st
Conference_Location
Williamsburg, VA
ISSN
2155-7195
Print_ISBN
978-1-4673-1699-6
Type
conf
DOI
10.1109/DASC.2012.6383117
Filename
6383117
Link To Document