DocumentCode :
2557641
Title :
Carmarthen Road, Swansea-bus priority within SCOOT
Author :
Evans, G. ; Withill, R.A.
Author_Institution :
West Glamorgan Council, UK
fYear :
1994
fDate :
26-28 Apr 1994
Firstpage :
81
Lastpage :
88
Abstract :
The traffic signals in this area were controlled by West Glamorgan County Council´s urban traffic control system using fixed time plans which were several years old. Although some additional capacity might be gained from the introduction of new timings, it was assessed that significant additional capacity could only be achieved by introducing SCOOT control to the region. The prime objective of this pilot study was to assess whether selective detection and SCOOT operation could be integrated without modification or development of the traffic signal controller software or the SCOOT system
Keywords :
road traffic; signalling; town and country planning; traffic control; traffic engineering computing; Carmarthen Road; SCOOT; Swansea; road traffic; traffic signal controller software; urban traffic control;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Road Traffic Monitoring and Control, 1994., Seventh International Conference on
Conference_Location :
London
Type :
conf
DOI :
10.1049/cp:19940430
Filename :
385788
Link To Document :
بازگشت