DocumentCode
2579263
Title
Well rate control design for gas coning problems
Author
Hasan, Agus ; Sagatun, Svein ; Foss, Bjarne
Author_Institution
Dept. of Eng. Cybern., NTNU, Trondheim, Norway
fYear
2010
fDate
15-17 Dec. 2010
Firstpage
5845
Lastpage
5850
Abstract
This paper presents a method which uses boundary control to increase the oil production in the subcritical phase of a thin oil rim reservoir which is drained via horizontal wells. The problem of finding an optimal well rate is considered using the backstepping method. The feedback control law is constructed explicitly and together with a reservoir-well simulator are used to generate a time varying production plan. The simulation result shows that the performance of the active control law is much better than conventional production strategies using constant oil rates until gas breakthrough.
Keywords
control system synthesis; feedback; hydrocarbon reservoirs; production control; time-varying systems; backstepping method; feedback control; gas coning problem; oil production; thin oil rim reservoir; time varying production plan; well rate control design; Backstepping; Equations; Mathematical model; Observers; Petroleum; Production; Reservoirs;
fLanguage
English
Publisher
ieee
Conference_Titel
Decision and Control (CDC), 2010 49th IEEE Conference on
Conference_Location
Atlanta, GA
ISSN
0743-1546
Print_ISBN
978-1-4244-7745-6
Type
conf
DOI
10.1109/CDC.2010.5717861
Filename
5717861
Link To Document