• DocumentCode
    2579263
  • Title

    Well rate control design for gas coning problems

  • Author

    Hasan, Agus ; Sagatun, Svein ; Foss, Bjarne

  • Author_Institution
    Dept. of Eng. Cybern., NTNU, Trondheim, Norway
  • fYear
    2010
  • fDate
    15-17 Dec. 2010
  • Firstpage
    5845
  • Lastpage
    5850
  • Abstract
    This paper presents a method which uses boundary control to increase the oil production in the subcritical phase of a thin oil rim reservoir which is drained via horizontal wells. The problem of finding an optimal well rate is considered using the backstepping method. The feedback control law is constructed explicitly and together with a reservoir-well simulator are used to generate a time varying production plan. The simulation result shows that the performance of the active control law is much better than conventional production strategies using constant oil rates until gas breakthrough.
  • Keywords
    control system synthesis; feedback; hydrocarbon reservoirs; production control; time-varying systems; backstepping method; feedback control; gas coning problem; oil production; thin oil rim reservoir; time varying production plan; well rate control design; Backstepping; Equations; Mathematical model; Observers; Petroleum; Production; Reservoirs;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Decision and Control (CDC), 2010 49th IEEE Conference on
  • Conference_Location
    Atlanta, GA
  • ISSN
    0743-1546
  • Print_ISBN
    978-1-4244-7745-6
  • Type

    conf

  • DOI
    10.1109/CDC.2010.5717861
  • Filename
    5717861