As a series of 700 MW class totally air-cooled hydroelectric generators has been put into operation in China, the development of hydroelectric generators has arrived at a new stage. To summarize the experience, taking the generator of Three Gorges Right Bank Power Station as an example, the design and operation features about 700 MW Class Totally Air-Cooled Hydroelectric generators are presented and discussed.
Keywords
cooling; hydroelectric generators; hydroelectric power stations; Three Gorges Right Bank Power Station; air-cooled hydroelectric generator; power 700 MW; Cooling; Hydroelectric power generation; Hydroelectric-thermal power generation; Machinery; Power generation; Stator cores; Stator windings; Temperature distribution; Thermal expansion; Thermal stresses; Hydroelectric Generator; air-cooling; thrust bearing;
fLanguage
English
Publisher
ieee
Conference_Titel
EUROCON 2009, EUROCON '09. IEEE
Conference_Location
St.-Petersburg
Print_ISBN
978-1-4244-3860-0
Electronic_ISBN
978-1-4244-3861-7
Type
conf
DOI
10.1109/EURCON.2009.5167679
Filename
5167679
Link To Document