• DocumentCode
    2589474
  • Title

    Implementation and field experience of a national energy control system

  • Author

    Barazesh, B. ; Vidigal, A. ; Oliveira, H. ; Lobo, O.G. ; Roldão, P. ; Paiva, J. P Sucena ; Barruncho, L. ; Giri, J.

  • Author_Institution
    Westinghouse Syst. Ltd., Chippenham, UK
  • fYear
    1989
  • fDate
    1-5 May 1989
  • Firstpage
    453
  • Lastpage
    460
  • Abstract
    A description is given of the National Control System of Electricidade de Portugal, a two-tier scheme which comprises nine control centers and 60 remote terminal units. This system became operational in 1988. Experience in the energy management system industry shows that projects of this nature have certain requirements in several areas for a smooth completion. These areas include specification of the system, design and application of the purchased product, and the procurement of the system. The authors review the way in which these requirements were addressed in the National Control System Project. Further, the potential areas for functional expansion of the system, the associated technology, and the ease of expansion due to the open nature of the system are discussed.<>
  • Keywords
    load management; power system computer control; Electricidade de Portugal; National Control System Project; energy management system; national energy control system; Communication system software; Control systems; Electrical equipment industry; Medical services; Power generation; Power systems; Procurement; Production facilities; Spine; Thermal loading;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power Industry Computer Application Conference, 1989. PICA '89, Conference Papers
  • Conference_Location
    Seattle, WA, USA
  • Type

    conf

  • DOI
    10.1109/PICA.1989.39030
  • Filename
    39030